The Greenland Creek property consists of 247 claims (15,000 acres) located 30km north of Kimberley, in southeastern British Columbia. Initial drilling on the property was carried out in 1996 by the Eagle Plains/Miner River joint-venture (now merged), and consisted of 5 drillholes totalling approximately 1800' (550m). Drilling completed in early November of 1997 consisted of 7 shallow holes comprising a total of 2000' (600m). All 7 holes encountered base-metal mineralization and alteration assemblages associated with sedex deposits. Numerous thin stratabound sulphide bands were intersected, some of which display continuity over 60m, and are open down-dip and along strike. |

Greenland - Project Details [PDF]
|