News

Eagle Plains Completes Fieldwork on K9 Base-Metals Project, South-Eastern British Columbia

Cranbrook, B.C., June 25th, 2019: Eagle Plains Resources Ltd. (EPL:TSX-V) has completed continuing exploration activity on its 100%-owned K9 Property located 30 km west of Kimberley, B.C. Target mineralization on the Property is stratabound massive sulphides (copper/silver/lead/zinc).  Past exploration by Eagle Plains identified a mineralized corridor which includes a strong 1.5 km-long soil geochemical anomaly associated with anomalous airborne geophysical features.

Eagle Plains’ Partner Rockridge Reports Final Results From 2019 Knife Lake Drilling Including 2.01% Cu and 2.45% CuEq over 15.2m Starting at 5.1m Downhole

Cranbrook, B.C., June 10th, 2019: Eagle Plains Resources Ltd. (TSX-V: EPL) (“Eagle Plains” or the “Company”) has received notice from Rockridge Resources (TSX-V: ROCK) (Frankfurt: RR0) that it has received and interpreted final results from the 12 hole, 1053 m inaugural winter drill program completed on Eagle Plains’ 100%-owned Knife Lake Project (the “Property”).

Eagle Plains Commences Geophysical Survey at Vulcan Silver-Lead-Zinc Project, Southeastern B.C.

Cranbrook, B.C., May 28, 2019: Eagle Plains Resources Ltd. (TSX-V: “EPL”) has mobilized field crews to carry out a geophysical survey on the Vulcan project located near Kimberley, BC. The property is considered to hold significant potential to host silver-lead-zinc mineralization similar to that at the world-class Sullivan deposit, located 30km to the east. The project is owned 100% by Eagle Plains and carries no underlying royalties or encumbrances.

Eagle Plains’ Partner Rockridge Intersects High Grade Copper in Holes 3, 4 and 5 at Knife Lake Project including 4.31% Cu and 5.05% CuEq over 13.2m within 2.03% Cu and 2.42% CuEq over 37.6m Starting from 11.2m Downhole

Cranbrook, B.C., May 07th 2019: Eagle Plains Resources Ltd. (TSX-V: EPL) (“Eagle Plains” or the “Company”) has received notice from Rockridge Resources (TSX-V: ROCK) (Frankfurt: RR0) that it has reported additional results from drilling completed during its 12 hole, 1053 m inaugural winter drill program at its flagship Knife Lake Project located in Saskatchewan (the “Knife Lake Project” or “Property”).

Eagle Plains Partner Intersects High Grade Copper at Knife Lake Project

Cranbrook, B.C., April 30th 2019: Eagle Plains Resources Ltd. (TSX-V: EPL) has received notice from Rockridge Resources (Frankfurt: RR0) (TSX-V: ROCK) (Frankfurt: RR0) that it has received results from drilling completed during its 12 hole, 1053 m inaugural winter drill program at its flagship Knife Lake Project located in Saskatchewan (the “Knife Lake Project” or “Property”).

Rockridge Resources Commences Winter Drilling Program at Eagle Plain’s Knife Lake Project, Northern Saskatchewan

Cranbrook, B.C., March 19th, 2019: Eagle Plains Resources Ltd. (TSX-V: “EPL”) has received notice from Rockridge Resources Ltd. (TSX-V: ROCK)  that it has commenced a winter diamond drilling program on the Knife Lake Property, owned 100% by Eagle Plains and under option to Rockridge. Winter drilling will consist of approximately 1,000m in eight to ten holes. The 85,196 ha Knife Lake claims cover both the historical Knife Lake VMS deposit and an extensive, under-explored regional VMS target area.

Eagle Plains Updates Brownell Lake, Olson Projects

Cranbrook, B.C., March 1st, 2019: Eagle Plains Resources Ltd. (TSX-V: “EPL”) has received notice from optionee Roughrider Resources Ltd. (“Roughrider”; TSX-V: “REL”) that it wishes to terminate the option agreements relating to the Brownell Lake (VMS-polymetallic) and Olson (gold) exploration properties located 120km east of La Ronge, Saskatchewan in order to focus efforts elsewhere.

Brownell Project Summary:     

Eagle Plains Executes Option Agreement for Donna Gold Project, South-Central British Columbia

Cranbrook, B.C., January 24th, 2018: Eagle Plains Resources Ltd. (“EPL”:TSX-V, “Eagle Plains”) has executed an option agreement with 1149781 BC Ltd. (a private B.C. company), (“1149781”) whereby 1149781 may earn up to a 60% interest in the Donna property located 60 km east of Vernon in central British Columbia.

Eagle Plains Completes Royalty Agreement with Denison Mines

Cranbrook, B.C., December 13th, 2018: Eagle Plains Resources Ltd. (TSX-V: “EPL”) has completed a tri-party agreement with Tarku Resources Ltd. (TSX-V-“TKU”) and Denison Mines Corp. (TSX-“DML”; NYSE American-“DNN”) whereby Denison Mines has purchased the 1,334 hectare Virgin River property which is contiguous with Denison’s South Dufferin Project located immediately south of the Athabasca Basin in northern Saskatchewan.

Eagle Plains and Rockridge Execute Option Agreement on the Knife Lake VMS Project in Saskatchewan

Cranbrook, B.C., November 1st, 2018: Eagle Plains Resources Ltd. (“EPL”:TSX-V, or “Eagle Plains”) and Rockridge Resources Ltd. (“ROCK” TSX-V, or “Rockridge”) have entered into an agreement (subject to regulatory approval) whereby Rockridge may earn a 100% interest in Eagle Plains’ 100%-owned Knife Lake Project, located approximately 50 kilometers northwest of the community of Sandy Bay, Saskatchewan.

Pages

Share