News

Eagle Plains Commences Drilling at 100%-Owned Donna Gold Project, South-central British Columbia

Cranbrook, B.C., June 10th, 2021: Eagle Plains Resources Ltd. (TSX-V:EPL) (“EPL” or “Eagle Plains”) has mobilized crews to commence drilling on its 100%-owned Donna Project located 60km east of Vernon, B.C.. Eagle Plains is planning a 5-7 hole, 1,500m (5,000’) drill program to test for gold and silver mineralization associated with a prominent gold in soil geochemical anomaly delineated at the Gossan Zone and to complete the first-ever drilling in the area of the historical Morgan mine workings.

Eagle Plains / SKRR Continue to Intersect Significant Gold Mineralization at the Olson Gold Project, Saskatchewan

Cranbrook, B.C., May 6th 2021: Eagle Plains Resources Ltd. (TSX-V: “EPL”, “Eagle Plains”) and SKRR Exploration (“SKRR”: CSE) have received results from the 12-hole, 1674m (5,492’) drill program recently completed on EPL’s 100%-owned Olson property (the “Property”).

Eagle Plains Completes Airborne Geophysical Survey at Eldridge and Puzzle Lake Projects, Saskatchewan

Cranbrook, B.C., April 20th, 2021: Eagle Plains Resources (TSX-V:EPL) has completed a high resolution airborne magnetic geophysical survey at its 100% owned Eldridge Lake and Puzzle Lake projects located in east-central Saskatchewan. Precision GeoSurveys Inc. of Langley, BC conducted the 1,981-line kilometer fixed-wing survey, flown at 100m line spacing.
 
See property location map here

Eagle Plains’ Partner Rockridge Resources Expands Drilling Program at Knife Lake Copper Project, Saskatchewan

Cranbrook, B.C., March 31st, 2021: Eagle Plains Resources (TSX-V:EPL) has been notified by option partner Rockridge Resources Ltd. (TSX-V: ROCK) (OTCQB: RRRLF) (Frankfurt: RR0) (“Rockridge”) that it has expanded the drill program underway at the Knife Lake Project located in Saskatchewan, Canada (the “Knife Lake Project” or “Property”). The 1,600 metre program (6 to 8 drill holes) has been expanded to 2,100 metres (10-12 drill holes) and is fully funded by Rockridge.

Eagle Plains Partner SKRR Reports Additional Gold Mineralization at Olson Gold Project, Follow-up Drilling Underway

Cranbrook, B.C., March 25th, 2021: Eagle Plains Resources Ltd. (TSX-V: “EPL”, “Eagle Plains”) and SKRR Exploration (“SKRR”: CSE) have received complete results from the 18 hole, 2981m (9,778’) Phase 1 drill program completed in Fall, 2020 on EPL’s 100%-owned Olson property (the “Property”).

Eagle Plains’ Partner Rockridge Resources Commences Drilling Program at Knife Lake Copper Project, Saskatchewan

Cranbrook, B.C., March 18th, 2021: Eagle Plains Resources (TSX-V:EPL) has been notified by option partner Rockridge Resources Ltd. (TSX-V: ROCK) (OTCQB: RRRLF) (Frankfurt: RR0) (“Rockridge”) that drilling activity in underway at the Knife Lake Project located in Saskatchewan, Canada (the “Knife Lake Project” or “Property”). Drilling follows an extensive airborne geophysical program completed recently by Rockridge (see news release March 11, 2021).

Eagle Plains’ Partner Rockridge Resources Completes Airborne Geophysical Program at Knife Lake Copper Project - Drilling Planned

Cranbrook, B.C., March 11th, 2021: Eagle Plains Resources (TSX-V:EPL) has been notified by option partner Rockridge Resources Ltd. (TSX-V: ROCK) (OTCQB: RRRLF) (Frankfurt: RR0) (“Rockridge”) that it has completed an airborne geophysical program the Knife Lake Project located in Saskatchewan, Canada (the “Knife Lake Project” or “Property”). Rockridge also announces its plans for an upcoming 1,600 metres minimum drill program.

Eagle Plains Acquires Deep Bay East Graphite Project

Cranbrook, B.C., March 2nd, 2021: Eagle Plains Resources Ltd. (TSX-V:EPL) (“EPL” or “Eagle Plains”) has acquired by staking, mineral tenures that cover the historic Deep Bay East graphite occurrence (Saskatchewan Mineral Deposit Index (SMDI) 0489. The 2043ha claim group is located 25km east of the community of Southend, Saskatchewan and less than 15km east of the Deep Bay West Graphite Deposit.

Project History

Pages

Share