|
Findlay Drilling Yields Significant
Results
Cranbrook, B.C.: Partners Eagle Plains Resources
Ltd. (EPL:ASE) and Miner River Resources Ltd. (MRG:ASE)
announce that final results have been received from
a drilling program carried out during late 1998 on their
50/50 joint-venture Findlay property located in southeastern
British Columbia within the North Sullivan Camp. Operator
Kennecott Canada Exploration Inc. currently has an option
to earn a 60% interest in the Findlay package by completing
$2,000,000 in exploration expenditures and making cash
payments of $250,000 to the companies by December 31,
2000.
During the course of Kennecott's $1,200,000 1998 program,
five holes were drilled totaling 1853 metres (6079
ft). Four holes were drilled in the southern portion
of the
property, three of which failed to yield significant
mineralization. Hole 98-04, drilled in the Pico Basin
near the neighbouring Greenland Creek property (see
Jan. 21/98 & Nov. 13/98 news releases), encountered
an extensive sheeted vein system containing lead and
zinc (with accessory cadmium, copper and tungsten) mineralization.
Drillhole 98-05 was collared near the northern boundary
of the property to test an extensive tourmalinite alteration
facies discovered in 1996 by Eagle Plains/Miner River.
This hole encountered significant base-metal enrichment
over 105.2m from a depth of 171.8m to 277.0m. Within
this interval, 46 individual thin stratabound mineralized
horizons were intersected. A summary of significant
results is as follows:
|
Hole No. |
Depth |
Azimuth/Incl. |
Interval |
Length |
Ag (ppm) |
Pb (ppm) |
Zn (ppm) |
|
98-01 |
478.2m |
085/-80 |
(no significant mineralization)
(no significant mineralization)
(no significant mineralization) |
|
98-02 |
135.3m |
049/-60 |
|
98-03 |
468.8m |
100/-85 |
|
98-04 |
488.0m |
080/-86 |
411.55-412.84m |
1.29m |
-0.2 |
-2 |
25,500 |
| |
439.00-439.34m |
0.34m |
7.4 |
3,550 |
7,140 |
|
98-05 |
282.9 |
166/-62 |
171.80-277.00m |
105.20m |
5.5 |
1,460 |
42 |
| |
176.00-176.48m |
0.48m |
14.4 |
17,700 |
12 |
|
193.00-193.17m |
0.17m |
32.6 |
18,800 |
30 |
|
199.98-200.15m |
0.17m |
62.2 |
37,500 |
4 |
|
207.75-208.08m |
0.33m |
29.6 |
22,200 |
32 |
|
212.97-213.30m |
0.33m |
57.0 |
24,200 |
40 |
|
215.03-215.35m |
0.32m |
41.8 |
16,200 |
30 |
|
216.16-216.25m |
0.09m |
264.0 |
129,500 |
68 |
|
272.50-274.00m |
1.50m |
205.0 |
134 |
34 |
Sampling was carried out by Kennecott personnel with
ICP analyses performed by Chemex Labs of Vancouver,
BC. Kennecott has indicated that it will carry out further
work on both the Findlay and Greenland Creek projects
during the 1999 field season in an attempt to vector
towards economic grade mineralization.
R. W. Termuende, President
|